Your Position - - Xixiayuan Counter Regulating Reservoir Project
Layout and Size
Main structures include: earth rockfill dam, flood gate, sediment gate, block power plant, Wangzhuang Diversion Gate, irrigation gate behind dam, and sediment tunnel beneath erection bay. The total dam axis is 3,122 m long, including 315 m concrete sections (for flood release, power generation and water diversion). The release and power structures are concentrated in the right-bank floodland, including 21 flood gates. Sediment release structures, including the sediment tunnel on the left side of the powerhouse, the sediment gate on the right, the bottom holes between the units, and Wangzhuang Diversion Gate, are all arranged on the right side of the flood gates. The irrigation gate is on the downstream left side of the powerhouse. In the floodlands on both banks and in the channel is a geomembrane sand-gravel dam with an inclining core, with a maximum height of 20.2 m, crest width of 8 m, crest elevation of 138.2 m, upstream slope of 1:2.75, and downstream slope of 1:2.25. This sand-gravel dam has a total length of 2609 m, including 1725.5 m on the left and 883.5 m on the right. The powerhouse is designed to have a maximum height of 51.5 m, with 4 x 35 MW movable propeller turbine units, providing a total installed capacity of 140 MW and a long-term average output of 583 GWH. A concrete cutoff wall is provided for seepage control purposes. This is classified as a large-sized (2) project at Grade II.

The reservoir is designed to have a total storage capacity of 162 million m3, a normal pool level of 134 m, and a limit level of 131 m during the flood season. The main quantities of work include 7.3 million m3 earth/rock excavation, 98000 m2 concrete cutoff wall, 853000 m3 concrete, 2.8322 million m3 earth/rock fill, 8720 t metal works, and 46000 t steel.

 
 
Information Center of Xiaolangdi Multipurpose Project Construction & Administration Bureau ,YRCC 
E-mail:Webadmin@xiaolangdi.com.cn